search
confirm
cancel
NEWS CENTER
Where are you now:
Homepage
>
>
Company news
09-01

200CPM D99mm Round Can Production Line Complete!

This round can proudction line for D99mm Height 148mm-175mm has the capacity of 200-220cpm. For the welder, We specially add a servo motor to individually control the big welding roller to avoid the welding line tail.
09-01

30 CPM 15L Square can body and End line in India

Our15L square can body line with 30cpm capacity in India is consist of duplex slitting machine, transfer robot arm, welder, body former, leakage testser. The end line with 30cpm capacity is consist of CNC sheet feeder, portal press, Curling and lining and drying machine, hole punching press, spot welder.
08-31

15L square

Our15L square can body line with 30cpm capacity in India is consist of duplex slitting machine, transfer robot arm, welder, body former, leakage testser. The end line with 30cpm capacity is consist of CNC sheet feeder, portal press, Curling and lining and drying machine, hole punching press, spot welder.
01-05

There are several common sterilization methods for food tins

1) Normal pressure sterilization method Put the iron box into boiling water at normal pressure for high temperature sterilization. (2) Pressure sterilization method Increasing the pressure of the s
12-02

Does the operator of the can making machine need training?

1. When the mechanic receives the abnormality of the mold, he must preliminarily determine the repairable time of the mold and inform the production team leader so that the team leader can make personnel arrangements. If the machine mold abnormality has not been dealt with for more than two hours, the machine repair should be reported to the machine repair supervisor; if the machine repair supervisor has not dealt with the abnormality for more than 1.5 hours, it should be reported to the technical manager for handling; 2. When the lower mold of an order mold is produced, the mechanic must first reserve a product in the mold cavity, then clean it with anti-rust oil and remove the mold, and close the upper and lower molds; 3. After the frame mold debugging is OK, the machine repairer will hand over the first product to the quality department for confirmation, and the quality department will fill in the mold first inspection record form, and the quality control and production team leader can confirm the first product before it is OK for mass production; 4. When the mold is abnormal because the parts need to be processed outside, it is not normal for more than 8 hours, the mold needs to be treated with anti-rust oil, and an application form for mold parts processing needs to be written at the same time; 5. The mold is found to be abnormal before returning to the warehouse, and it needs to be repaired before returning to the warehouse.
01-05

How to open the paint bucket What are the tips for using the paint bucket

How to open the paint bucket: 1) Use a screwdriver to pry loose the bayonet under the lid of the paint bucket. Note that you only need to pry halfway, not all of them. 2) Then open the lid by 45 degre
上一页
1
2
3

Contact us

 

Add:103 Front Floor The Third District Xihua Area Guanyi Street ChenghaDistrict Shantou City Guangdong Province China

Phone:+86 15815003674/15017203823

Telephone:+86-0754-89839587

Email:info@stguanyou.com

 

Guanyou

Mobile client

Inquiry
Cloudre

Copyright (c)   Shantou Guanyou Machinery Co., Ltd.  All Rights Reserved      粤ICP备2021149118号      Powered by www.300.cn     SEO label